We offer this service to help you ensure that all structural elements of your project meet approved standards. You can request a Municipality inspection to audit the execution by the consultant and contractor based on the building license and approved drawings.
How Long Will It Take? 2 working days
What Will You Get? Request Approval
How Do You Apply?
You can apply for this service through your consultant at https://rakdigital.rak.ae by using your UAE Pass and select “Structural Inspection” to begin your application.
Fill in the application form and upload all required documents.
Pay the required application fee to initiate the process.
The consultancy office must obtain prior approval for the site visit before leaving the site, ensuring the structural elements' integrity is verified.
Pay the fee through one of the following methods: the website, the mRAK Smart App, or payment machines at Customer Happiness Centres.
A supervision engineer will conduct a site visit to inspect the executed works against the approved drawings.
Once reviewed and finalized, you will receive the inspection outcome via email and text message.
How Much Will You Pay?
Inspector’s visit for residential villas/annexes: AED 50 (per stage)
Inspector’s visit for investment villas: AED 100 (per stage)
Audit fee for up to two storey building (G+3 or less): AED 50 (per stage)
Audit fee if the building has more than two storeys (more than G+3): AED 100 (per stage)
Audit fee for foundation of fences: AED 50 Surveying for fence foundation: AED 300
What Documents Do You Need?
Application submission form.
Consultant report template (checklist for structural elements).
What Terms and Limitations Apply?
Terms :
The structural work must follow approved drawings and be audited by the supervising consultant.
Submit inspection requests for Foundations, Tie Beam, Slab, and Foundation of the Boundary Wall for Fences.
Accept only foundation inspections for industrial buildings.
Prior to requesting inspection, make sure that the excavation certificate and plot demarcation have been approved in the system.
Services Link
You can apply online through https://rakdigital.rak.ae/index.html?sap-language=ar#/Lobby/ZS04
FAQ
What is the purpose of the structural inspection service?
The service helps ensure that all structural elements of your project meet approved standards by allowing a Municipality inspection to audit the execution by the consultant and contractor.
How long does the inspection process take?
The inspection process takes 2 working days.
How can I apply for the structural inspection service?
You can apply through your consultant at https://rakdigital.rak.ae using your UAE Pass and selecting 'Structural Inspection' to begin your application.
What documents are required for the application?
You need to submit an application form and a consultant report template (checklist for structural elements).
What are the fees for the inspector's visit?
The fees vary: AED 50 for residential villas/annexes and AED 100 for investment villas, among others.
Is prior approval needed before the site visit?
Yes, the consultancy office must obtain prior approval for the site visit to verify the structural elements' integrity.
What types of inspections can be requested?
You can submit inspection requests for Foundations, Tie Beam, Slab, and Foundation of the Boundary Wall for Fences.
Can I pay the application fee online?
Yes, you can pay the fee through the website, the mRAK Smart App, or payment machines at Customer Happiness Centres.
Will I receive the inspection outcome via email?
Yes, once reviewed and finalized, you will receive the inspection outcome via email and text message.