--- title: "Compliance with project allocation limits and engineering capacity (Circular No. 3 of 2026)" slug: "compliance-with-project-allocation-limits-and-engineering-capacity" updated: 2026-05-07T10:34:12Z published: 2026-05-07T10:34:12Z canonical: "sanad.mun.rak.ae/compliance-with-project-allocation-limits-and-engineering-capacity" --- > ## Documentation Index > Fetch the complete documentation index at: https://sanad.mun.rak.ae/llms.txt > Use this file to discover all available pages before exploring further. # Compliance with project allocation limits and engineering capacity (Circular No. 3 of 2026) **Urban Development Sector Circulars – 2026** Compliance with project allocation limits and engineering capacity (Circular No. 3 of 2026) Defines the maximum allowable project areas per engineer and reinforces the responsibility of supervision by licensed consultants. [PDF document](https://cdn.document360.io/f807adc9-f767-4987-a868-875213da5e60/Images/Documentation/Compliance with project allocation limits and engineering capacity_Circular No. 3 of 2026_تعميم رقم 3 لعام 2026.pdf?sv=2026-02-06&spr=https&st=2026-11-22T04%3A48%3A49Z&se=2026-11-22T05%3A48%3A49Z&sr=b&sp=r&sig=5%2Fb8qRpqtuFlqA6GDZkk6yOlvaVk1uMCgKXJIRgHfT0%3D)